Lockheed Martin (NYSE: LMT) said it successfully completed a live-fire demonstration of the Spike Non-Line-of-Sight (NLOS) system from an Infantry Squad Vehicle – Utility variant (ISV-U) at Dugway Proving Grounds, Utah, validating the system’s performance in a ground-based operational environment and advancing the U.S. Army’s Mobile-Long-Range Precision-Strike Missile (M‑LRPSM) directed requirement.
The three-day event featured 17 precision engagements against simulated operational targets at varied combat ranges, with most shots conducted by U.S. Army infantry soldiers. All shots were launched from an ISV‑U, marking the first firing of Spike NLOS from this mobile platform.
The company said the demonstration showed soldiers can safely employ the missile from a mobile platform to strike beyond line of sight with the precision required for high‑value targets. Transformation‑in‑Contact units participated early, providing real‑time feedback to help shape M‑LRPSM requirements. Additional validation testing over the next year is planned ahead of Phase 3, when initial operational production begins and final system prototypes will be delivered to the Army.
Lockheed Martin said integrating Spike NLOS onto ISV‑U platforms for the Army’s Mobile Brigade Combat Team is intended to provide a non‑line‑of‑sight capability that enhances combat agility and shortens decision cycles in high‑intensity conflict. Soldiers completed system training and live‑fire missions within the same week, indicating rapid training and ease of use, the company said.
“This demonstration represents a critical milestone for Spike NLOS, showing that our infantry partners can confidently employ a long-range precision missile,” said Casey Walsh, program director, Lockheed Martin Multi-Domain Missile Systems. “The live‑fire data and soldier feedback gathered here will support the shaping of the final M‑LRPSM requirements and accelerate the fielding of a game‑changing long‑range precision strike capability.”
TIC units will maintain a hands‑on role in continued validation testing, with ongoing user feedback captured through soldier touchpoint opportunities to inform M‑LRPSM requirements. The effort builds on earlier Phase 1 and Phase 2 milestones for Spike NLOS.







